Commissioned by WML, Technische Alliantie installed a booster unit at a new-build project in Maastricht.
The work ran from relocating the site isolation valves through to placing the concrete chamber. The pump set we assembled ourselves was installed in that chamber, controlled by a variable frequency drive (VFD).