Drinking water production company
Modification of a filter arrangement at a drinking water plant
3D scan, 316L stainless steel pipework and installation in 10 weeks
- Drinking water
Cookies on this site
Without consent, the site counts page visits without a cookie. Recognising returning visitors and measuring advertising only happen after consent. This can be changed later via Cookie settings at the bottom of every page. Privacy policy (Dutch)
These cookies remember the cookie choice, so the notice does not return on every page. No consent is needed for this.
With consent, the site recognises a returning visitor. Without consent, the site counts every page visit without a cookie: which page, and via which link or campaign the visitor arrived.
With consent, the site stores which Google ad brought a visitor to the site, so it can be measured whether that ad leads to an enquiry. Google may then also personalise ads. Once ads are running, Google also places its own cookies.
Breakdown? +31 (0)85 483 09 38 info@technischealliantie.com
Oudeweg 80, 6067 CA Linne LinkedIn
Approach
Project management at Technische Alliantie runs from the first idea to the commissioning of an installation. You can come in or step out at any phase: have just one phase carried out, or hand the entire process, from initiative to realisation and maintenance, over to us. Project management lies with our engineers, who also produce the design. For tenders, we draw up specifications and bills of quantities.
Phases
Formulating the project objective, the scope and the project brief.
Compiling a concrete set of requirements and the project programme.
Working out the sketch design, preliminary design, final design and detailed design in stages.
Determining the method, the materials, and the people and resources.
Steering the entire process on the basis of the project programme, so that the product is executed as intended.
Actually building the product, up to and including commissioning.
From the start
The service department is involved from the initiative phase, contributing its practical experience of maintenance and breakdowns. This is aimed at an installation with the lowest possible Total Cost of Ownership.
If your project goes out to tender, we draw up the specification and the bills of quantities.
Example
Engineering mapped the existing situation at a drinking water plant with a 3D scan and determined the pipe route together with the client. The Pipework department produced the pipework in 316L stainless steel and the service department carried out the installation to a tight schedule. From engineering up to and including installation, it took 10 weeks.
View the project
Completed
Drinking water production company
3D scan, 316L stainless steel pipework and installation in 10 weeks
WML · Maastricht
From the site isolation valves to the concrete chamber, with a pump set we assembled ourselves
Coating company
Conditioning installation with heat exchangers, prefabricated and insulated
Questions
Enquiry
Briefly describe what needs to be done. We will contact you as soon as possible.
Prefer to discuss it first? Call +31 (0)85 483 09 38.