For an installation that has yet to be built, the engineers at Technische Alliantie produce the design, from the first sketch design to the detailed design. The engineers also take care of the project management; the build preferably goes to the in-house departments.

3D model of a staircase and platform in an installation, shown on a screen

The design in stages

The design phase runs through a sketch design, a preliminary design and a definitive design to the detailed design. It is preceded by the initiation phase, in which the project objective and scope are set, and the definition phase, with the set of requirements and the project programme. You can read how these phases come together in project management under project management and work preparation. The engineers have knowledge of mechanical and electrical engineering, with specialisations including instrumentation, machine building and process engineering.

An example: designing on a P&ID

For the conditioning installation with heat exchangers for a degreasing fluid, for a company that coats cladding panels, we first worked out a P&ID: a diagram of the pipes, the equipment and the instrumentation and control. On that basis, the design was set up together with the client and developed into a complete package.

The installation was then prefabricated in the workshop and assembled as a single unit. After the client’s approval, all components were dismantled, then reassembled and connected at the client’s site. After commissioning, the connected pipe sections were handed over insulated. View the project

The pump plinth for a pump supplier also started as a 3D drawing. It was designed by the Engineering department, fabricated by the Steelwork department and, including the pump, installed on site by the Service department.

Designing with maintenance in mind

During the design, the engineers already take the operation and maintenance of the installation into account. The service department contributes practical input in the initiation phase. The aim is the lowest possible Total Cost of Ownership: the costs over the entire service life of the installation.

Questions

Questions about new installations

Can you produce just the design?
Yes. You can have a single phase carried out, such as the design, or entrust the entire process to us, from initiative to realisation and maintenance.
Do you also draw up a specification for the tender?
Yes, we draw up specifications and bills of quantities for use in tenders.

Enquiry

Have a new installation designed

Briefly describe what needs to be done. We will contact you as soon as possible.

Prefer to discuss it first? Call +31 (0)85 483 09 38.

All fields are required unless marked (optional).

Describe in a few sentences what needs to be done.

Please enter your name.

Please enter your email address so that we can reply.