A condensate tank had to be replaced at a manufacturing company in Weert.

At the client’s request, our engineering department first made a 3D scan of the existing situation. A matching 3D model was then made from that scan. In the design, care was taken that as little of the existing pipework as possible had to be modified, to keep costs down.

The tank was then fully prefabricated in the workshop. Installing the tank, including modifying the pipework, was completed in 22 hours non-stop.