Pump supplier
Pump pedestal for a pump supplier
Designed by Engineering, built by Structural Steelwork, installed by Service
Cookies on this site
Without consent, the site counts page visits without a cookie. Recognising returning visitors and measuring advertising only happen after consent. This can be changed later via Cookie settings at the bottom of every page. Privacy policy (Dutch)
These cookies remember the cookie choice, so the notice does not return on every page. No consent is needed for this.
With consent, the site recognises a returning visitor. Without consent, the site counts every page visit without a cookie: which page, and via which link or campaign the visitor arrived.
With consent, the site stores which Google ad brought a visitor to the site, so it can be measured whether that ad leads to an enquiry. Google may then also personalise ads. Once ads are running, Google also places its own cookies.
Breakdown? +31 (0)85 483 09 38 info@technischealliantie.com
Oudeweg 80, 6067 CA Linne LinkedIn
Design & Build
An installation often involves structural steelwork, such as a plinth for a pump, a tank or a cleaning trolley. Technische Alliantie makes such components in stainless steel, steel and aluminium, based on a design by our engineers. For structural steelwork we also work with established partners.
For a pump supplier, we made a pump plinth based on a 3D drawing. Engineering designed the plinth, Structural Steelwork fabricated it and Service installed it on site, including the pump. The inside was given a Kiwa-approved coating and the outside the requested RAL colour. The plinth was aligned and transported on a transport frame (view the project).
A cleaning trolley was designed together with the client, worked out by our engineering team and produced by the structural steelwork department. The trolley is made entirely of stainless steel, with a large cleaning tub, a collection tray underneath and a specially developed clamping system (view the project).
Two examples of components that were first assembled in the workshop. The condensate tank for a manufacturing company in Weert was fully prefabricated in the workshop; installation, including modifying the existing pipework, then took 22 hours non-stop (view the project). A heating system for degreasing fluid was assembled as a single unit in the workshop, dismantled after approval and reassembled at the client’s site (view the project).
Our welders weld steel, stainless steel and aluminium using the MIG/MAG and TIG processes, and also repair metal structures and machines on site. More on this under welding.
Completed
Pump supplier
Designed by Engineering, built by Structural Steelwork, installed by Service
Designed together, built entirely in stainless steel, with its own clamping system
Manufacturing company · Weert
3D scan, prefabricated in the workshop and installed in 22 hours non-stop
Coating company
Conditioning installation with heat exchangers, prefabricated and insulated
Enquiry
Briefly describe what needs to be done. We will contact you as soon as possible.
Prefer to discuss it first? Call +31 (0)85 483 09 38.