Drinking water company in the central Netherlands
Pipe sections for a drinking water pumping station
Steel pipe sections, finished to KIWA BRL-K 758 and externally inspected
- Drinking water
Cookies on this site
Without consent, the site counts page visits without a cookie. Recognising returning visitors and measuring advertising only happen after consent. This can be changed later via Cookie settings at the bottom of every page. Privacy policy (Dutch)
These cookies remember the cookie choice, so the notice does not return on every page. No consent is needed for this.
With consent, the site recognises a returning visitor. Without consent, the site counts every page visit without a cookie: which page, and via which link or campaign the visitor arrived.
With consent, the site stores which Google ad brought a visitor to the site, so it can be measured whether that ad leads to an enquiry. Google may then also personalise ads. Once ads are running, Google also places its own cookies.
Breakdown? +31 (0)85 483 09 38 info@technischealliantie.com
Oudeweg 80, 6067 CA Linne LinkedIn
Sector
We build water treatment plants and piping systems with pump technology; we make the pipework in our workshop in Linne. For civil engineering, electrical engineering and structural steelwork, we work with established partners. Pump overhaul, welding, pipe repair and the inspection of hydrophore tanks are also part of Design & Build.
Services
For a drinking water producer, our Engineering department mapped the existing filter arrangement with a 3D scan and determined the pipe route in consultation with the client. Based on the approved design, the Pipework department made the pipe sections in 316L stainless steel, after which our service department installed them on site. From engineering through to installation, this took 10 weeks (view the project).
A pump plinth for a pump supplier followed the same route: designed by Engineering, fabricated by Structural Steelwork and installed on site, including the pump, by Service. The condensate tank for a manufacturing company in Weert also started with a 3D scan by Engineering. The tank was fully prefabricated in the workshop and then installed in 22 hours non-stop, including modifying the existing pipework.
In the workshop in Linne, we fabricate pipework for production and process installations, drinking water systems and the food industry, and we weld (stainless) steel and aluminium. The first inspection and acceptance of pipe sections for a power station also took place here.
Water treatment projects on a DBFO basis (design, build, finance and operate) are possible, together with partners.
Completed
Drinking water company in the central Netherlands
Steel pipe sections, finished to KIWA BRL-K 758 and externally inspected
WML · Maastricht
From the site isolation valves to the concrete chamber, with a pump set we assembled ourselves
Chemical company
In phases from steel to ductile iron, with new valves and fittings
Enquiry
Briefly describe what needs to be done. We will contact you as soon as possible.
Prefer to discuss it first? Call +31 (0)85 483 09 38.