Client
Chemical company
Two fitters lowering a new blue firefighting water pipe into the trench

A chemical company asked us to replace its firefighting water network in phases. The old steel pipe network is being replaced with ductile iron pipe, and all valves and fittings are being renewed. We do this together with our service engineers.

In the event of a leak, operations require the firefighting water network to be out of service for as short a time as possible, and only partially. Because our departments carry out the work together, it could be done efficiently and with the shortest possible lead time.

After the repair, the pipe trench is first partially backfilled and compacted with clean sand. The pipe is then pressure-tested, and only then is the trench fully backfilled and compacted.