As a repair to a hydrophore tank, we replaced the DN600 manhole.
Because the tank is under considerable pressure, only approved welding was used. The welds were calculated by the engineering department and all checked afterwards; they meet the standard.
The tank was then blasted and given a Kiwa coating, and we put the tank back into service.